|
Sl.No. |
Item |
Description |
|
01 |
Elevators |
Two high-speed elevators of all stainless steel of 'KONE'
make. Each of 16 passengers capacity. |
|
02 |
Air Conditioning |
Central air conditioning of adequate capacity terminating at the AHU
of each floor. (Screw chillers with air-cooled units). |
|
03 |
Fire Fighting |
a) Automate Building Management System.
b) All provisions for fire safety as per WBEFS Stipulations.
C) Fire Brigade in Proximity. |
|
04 |
Generator |
100% Power back- up power. |
|
05 |
Security |
a) Centralized security System (automated).
b) Closed circuit surveillance camera in the entrance lobby. |
|
06 |
Water Supply |
Filtered Water Supply. |
|
07 |
Communication |
a) Appropriate communication network.
b) Pre-wired termination for 50 telephone lines at each floor. |
|
08 |
Services on each floor |
Toilets, electricals and air handling unit (AHU). |
|
09 |
Maintenance |
a) Professional maintenance if the building.
b)24 hours operation of building maintenance for emergency function. |
|
10 |
Car Parking |
Adequate car parking area in the basement and on the ground
floor (open). |
|
11 |
Intelligent Building |
Intelligent building management system for fire detection,
access control (security) and air conditioning. |
|
12 |
Ceiling Heights |
Ground :- 3.875 mtrs.
1st and 2nd :- 3.75 mtrs.
3rd floor & up :- 4.00 mtrs. |
|
13 |
Power Supply
|
Adequate three phase power supply to all floors. |
|
14 |
Lobby |
Decorative Flooring. |
|
15 |
Building Front Facade |
Structural glazing. |
|
16 |
Modern Construction Techniques |
Post Tensioned (P.T.) Flat slabs with no beam projections.
Casting with Ready Mix Concrete. |
|
17 |
Driveways & Open Parking |
Finished with decorative paver tiles. |