Specifications

 

Finishing Specifications for IT/BPO Building

 
Sl.No. Item Description

01

Elevators Two high-speed elevators of all stainless steel of 'KONE' make. Each of 16 passengers capacity.
02 Air Conditioning Central air conditioning of adequate capacity terminating at the AHU of each floor. (Screw chillers with air-cooled units).
03 Fire Fighting a) Automate Building Management System.
b) All provisions for fire safety as per WBEFS Stipulations.
C) Fire Brigade in Proximity.
04 Generator 100% Power back- up power.
05 Security a) Centralized security System (automated).
b) Closed circuit surveillance camera in the entrance lobby.
06 Water Supply Filtered Water Supply.
07 Communication a) Appropriate communication network.
b) Pre-wired termination for 50 telephone lines at each floor.
08 Services on each floor Toilets, electricals and air handling unit (AHU).
09 Maintenance a) Professional maintenance if the building.
b)24 hours operation of building maintenance for emergency function.
10 Car Parking Adequate car parking area in the basement and on the ground floor (open).
11 Intelligent Building Intelligent building management system for fire detection, access control (security) and air conditioning.
12 Ceiling Heights Ground           :- 3.875 mtrs.
1st and 2nd     :- 3.75   mtrs.
3rd floor & up  :- 4.00   mtrs.
13 Power Supply Adequate three phase power supply to all floors.
14 Lobby Decorative Flooring.
15 Building Front Facade Structural glazing.
16 Modern Construction Techniques Post Tensioned (P.T.) Flat slabs with no beam projections. Casting with Ready Mix Concrete.
17 Driveways & Open Parking Finished with decorative paver tiles.
 

© Copyright, Sugam Group, 2008. All Rights Reserved.